All News

NOTICE OF CHANGE IN THE RATES AND TARIFFS OF UNITED POWER, INC.

DATE OF NOTICE: April 26, 2024

You are hereby notified that UNITED POWER, INC. (United Power) proposes to make changes to several of its rate tariff schedules to become effective for energy usage on or after June 1, 2024. An increase is necessary for all rate classes to fund the exit from United Power’s Wholesale Supplier. There will be a 5.7% increase to the Large Commercial Coincidental Peak Primary Demand (CPP1) and a 6.1% increase to the Large Commercial Coincidental Peak Secondary Demand (CPS1). There will be an 8.6% increase to the Industrial Service Substation or Transmission Service (ITD1), a 9.2% increase to the Industrial Service Substation or Transmission Service (ITD3), and a 9.6% increase to Industrial Service Substation/Transmission Service (ITD4) rates. The Residential Time of Use (RTD1), Residential Smart Choice (RD1), Residential TOU Demand Service (RDP1), Large Commercial Secondary Demand Service (ISD1), and Large Industrial Primary Demand Service (IPD1) rates will have a 9.7% increase. The increase to the Residential (R1), Small Commercial (C1), and Small Commercial Time of Use (CTD1) rates will be 9.8%. The Industrial Service Substation or Transmission Service (ITD2) rate will have an increase of 9.9%. The increase to the Irrigation (IRR2) rate will be 10%. The Shared Lighting Service rate will have an increase of 11.3% and the Non-Metered Lighting Service rate will have an increase of 11.5%. The Small Industrial Primary Service (SIP1) rate increase will be 14%. The Renewable Resource Green Power Optional Rider Tariff, Sheet 9.3, will reflect updated program requirements and rates, effective Aug. 1, 2024, for a new, 100% Offset option on a per kWh basis and 100-kWh blocks. 

In addition to rate tariff changes, there are minor modifications to update and reflect current business practices in the Rules and Regulations. These updates are to become effective on or after June 1, 2024. The identified areas needing revisions or updating include: (1) Service Connection and Line Extension Fee Schedule and (2) Current Business Practices for estimated billings. 

The present and proposed tariff provisions are available for examination at the Coal Creek branch office, located at 5 Gross Dam Road, Golden, CO; the headquarters office located at 500 Cooperative Way, Brighton, CO; and the Carbon Valley Service Center office at 9586 E. I-25 Frontage Road, Longmont, CO.

Anyone who desires to comment about the proposed changes shall file either an informal complaint or a formal complaint with United Power at 500 Cooperative Way, Brighton, CO 80603 at least 10 days before the proposed effective date. 

An informal complaint shall be in writing and shall contain such facts and other information to adequately state the reason(s) for the complaint. An informal complaint regarding the proposed tariff changes shall be considered by United Power, but will not require that a hearing be held.

Anyone who desires a hearing must file a specific and formal complaint to the proposed changes and a request for hearing at least 10 days before the proposed effective date. A formal complaint shall be in writing in the form prescribed by United Power’s Regulations Governing Consumer Complaints and Related Matters. Upon request, a copy of said regulations is available from United Power.

United Power may hold a hearing to determine what changes will be authorized, regardless of complaints. If proper formal complaints and request for hearings are timely filed, the United Power Board of Directors shall schedule a hearing. The changes ultimately authorized may or may not be the same as those proposed and may include changes different than those tariffs proposed or currently in effect. Anyone who desires to receive notice of hearings, if any, shall make a written request therefor to United Power, at the above address, at least 10 days before the proposed effective date.

UNITED POWER, INC.

By: Mark A. Gabriel, President and Chief Executive Officer